Table 4A: Significant Recommendations from Previous Semiannual
Reports for Which Corrective Action Has Not Been Completed
Subject |
Report No. |
Issue Date: |
Office Rec.No. |
Summary and Status of Recommendation |
Office of the Librarian |
Raiser’s Edge Software Program |
2006-IT-302
December 2007 |
Development Office |
III |
System managers for Raiser’s Edge should regularly review
the system’s transaction logs for suspect data events—The
Office of the Librarian will work with ITS to develop the
technical and operational processes required to make automated
log reviews of Raiser’s Edge functional. The target date
for implementation is the fourth quarter of FY14. |
Multi-Sector Workforce |
2010-PA-105 March 2011 |
Office of the General Counsel |
III.1 |
Create a policy using Internal Revenue Service rules to
properly classify workers as independent contractors or
employees and require service units to submit documentation
to the Office of Contracts and Grants Management
(OCGM) for nonpersonal contract services—The Office of
the General Counsel (OGC) addressed this issue by training
Library managers and OCGM. Changes to LCR 2111
and Form 52 will be addressed in conjunction with other
contract guidance under the Governing Documents initiative.
The target date for implementation is the fourth quarter
of FY 14. |
Performance-based
Budgeting III |
2013-PA-101
March 2013 |
Library-wide |
II.1 |
Incorporate in the financial statements, where applicable,
management discussion and analysis information about
unmet performance targets and related goals, plans, and
schedules for achieving them, assessments of practicality and
feasibility of the goals, and disclosure of the action that management
must take for success—Beginning with FY 13, explanations
of why targets were unmet and actions to improve
performance were submitted by service units. The Library’s
FY 14 Financial Statements will describe validation and verification
of performance information recorded in the management
discussion and analysis (MD&A) section and unmet
targets. Target date for implementation is the first quarter
of FY 15. |
Performance-based Budgeting III |
2013-PA-101
March 2013 |
Library-wide |
II.2 |
Add to MD&A disclosures an explanation of how management
ensures the accuracy and reliability of the data used
to measure progress towards each of its performance goals,
including an identification of the means used to verify and
validate measured values, the data sources, the required level
of data accuracy, data limitations, and compensation implemented
for the limitations to reach the required level of accuracy—
Beginning with the Library’s FY 14 Financial Statements,
the report will describe the process used to validate
and certify accuracy of the performance information recorded
in the MD&A section. Target date for implementation is
the first quarter of FY 15. |
Performance-based Budgeting III |
2013-PA-101
March 2013 |
Library-wide |
II.3 |
Develop a separate performance accountability report to fit
the Library’s compliance with the spirit of the Government
Performance and Results Act and the Modernization Act
and fully disclose to stakeholders and the public the annual
results of its performance management efforts. The Library
should place this report on its public Web site—The Library
is developing a Performance and Accountability Report. The
draft incorporates most of the elements described in the OIG
report. The Library will refine the draft in FY 14 and publish
the financial statements on its Web site. The target date for
implementation is the second quarter of FY 15.; |
Office of Contracts and Grants Management (OCGM) |
Weaknesses in the Acquisition Function |
2011-SP-106
March 2012 |
Office of Contracts and Grants Management |
I.A.1 |
Establish a support component to ensure effective and efficient
performance of critical functions that support the
OCGM. The position should be staffed with a senior, experienced
General Schedule 1102, Grade 14—The OCGM
receives policy support from the OGC and is recruiting for
a GS-1102-14 to support contract operations. The expected
target date for implementation is the third quarter of FY 14. |
Weaknesses in the
Acquisition Function |
2011-SP-106
March 2012 |
Office of Contracts
and Grants
Management |
I.A.2 |
Rewrite the Contracts Operating Instructions (COI) manual
deleting those policies that merely restate the Federal Acquisition
Regulations (FAR) and draft specific guidance geared
toward the Library’s acquisition activities. Organize the COI
so that it is easily accessible—As part of the Library’s Governing
Documents initiative the COI manual was updated
and included in the Contracts Technical Guide. The guide
is scheduled for publication in the fourth quarter of FY 14. |
Weaknesses in the
Acquisition Function |
2011-SP-106
March 2012 |
Office of Contracts
and Grants
Management |
I.F.2 |
Rewrite COI 1003 to be a more comprehensive oversight
policy and contract review process—The oversight and review
process of COI 1003 was updated and included in the
consolidated Contracts Technical Guide. The guide is scheduled
for publication in the fourth quarter of FY 14. |
Weaknesses in the
Acquisition Function |
2011-SP-106
March 2012 |
Office of Contracts
and Grants
Management |
II.G.1 |
Develop directives that clearly set forth the policy and constraints
for using LCR 2111—LCR 2111 is being revised,
updated, and incorporated into the Contracts Technical
Guide, corresponding with other guidance related to service
contracts. The guide is scheduled for publication in the
fourth quarter of FY 14. |
Weaknesses in the
Acquisition Function |
2011-SP-106
March 2012 |
Office of Contracts
and Grants
Management |
III.B.1 |
Restructure the Alert Handbook into a series of user-friendly,
PowerPoint® customer service training packages directed at
two levels, executive leadership and service units—OCGM is
updating portions of the its Web site to include acquisition
information, contracting officer’s representative (COR) certification
and training, and templates for use by contracting
staff and CORs. Content updates will continue through the
Library’s Governing Documents initiative. The target date
for completion is the fourth quarter of FY 14. |
Weaknesses in the
Acquisition Function |
2011-SP-106
March 2012 |
Office of Contracts
and Grants
Management |
III.B.4 |
Develop a procurement process standard operating procedure
so that customers understand that a good procurement
package includes a statement of work, market research,
independent government cost estimate, and the evaluation
factors used in the evaluation process. The procedure should
include a procurement package checklist—The Director of
OCGM briefed Library supervisors and IT collaborative forums,
and targeted senior staff meetings on contract-related
issues. Training for contract staff and CORs on acquisition
planning, contract formation and structure, and contract administration
is also ongoing. The Director worked with OSI
on the related business workflows for OCGM and will incorporate
results into future training and development sessions.
OCGM is updating their Web site to include acquisition information,
COR certification and training, and templates for
use by contracting staff and CORs. The target completion
date for implementation is the fourth quarter of FY 14. |
Page 18 MARCH 2014 SEMIANNUAL REPORT TO THE CONGRESS
Table 4A: Significant Recommendations from Previous Semiannual
Reports for Which Corrective Action Has Not Been Completed
Subject |
Report No. |
Issue Date: |
Office Rec.No. |
Summary and Status of Recommendation |
Office of Contracts and Grants Management (Continued) |
Improper Payments II |
2011-SP-101
May 2011 |
Office of Contracts
and Grants
Management |
I.2 |
OCGM and the Office of the Chief Financial Officer
(OCFO) should update directives to officially reflect the
current spending limit for micro purchases of $3,000—The
Purchase Card Technical Guide is in draft, awaiting review. It
reflects the current micro purchase threshold of $3,000 for
supplies and $2,500 for services. The technical guide will be
published as part of the Governing Documents initiative.
The guide will also correspond with FAR 13 on simplified
acquisition procedures for purchases at or below the micro
purchase threshold. The target date for implementation is the
fourth quarter of FY 14. |
Office of Opportunity, Inclusiveness, and Compliance (OIC)
Equal Employment
Opportunity
Complaints Office |
2001-PA-104
February 2003 |
Office of
Opportunity,
Inclusiveness, and
Compliance |
I |
Evaluate and revise LCR 2010-3.1—Evaluation and revision
of LCR 2010-3.1 is complete. The Office of Workforce Development,
OGC and the Office of Opportunity, Inclusiveness,
and Compliance (OIC) will work with the collective
bargaining units on final revisions and language. Target date
for implementation is the fourth quarter of FY 14. |
Follow-Up Review of the
Office of Opportunity,
Inclusiveness, and Compliance |
2011-PA-106
June 2011 |
Office of
Opportunity,
Inclusiveness, and
Compliance |
II.2.b |
OIC, in collaboration with the Library’s Human Capital
Management Flexibilities Working Group, should complete
the barrier identification and elimination process initiated
with the Multi-Year Affirmative Employment Program
Plan (MYAEPP) by assessing the success of the plan—Based
upon workforce assessment data, the Human Capital Planning
Board concluded that developing a Master Recruitment
Plan for each vacancy requires collaboration between Human
Resources Services (HRS), OIC, and service units. The plan
will address the professional needs of service units and underrepresented
groups. The MYAEPP Reassessment Working
Group completed its assessment and made a specific recommendation
to the Human Capital Planning Board to develop
a comprehensive Strategic Diversity Plan networked to all
diversity-related programs, activities, services and collections
at the Library. The target implementation date is the fourth
quarter of FY 14. |
Office of Support Operations (OSO) |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
I.1 |
Determine whether centralizing teleworking policy authority
in a Telework Coordinator would add value to the program—
The Telework Steering Committee (TSC) assesses
the effectiveness of the Library’s telework strategy, reviews
emerging best practices, evaluates infrastructure equipment,
recommends processes to address changes in technology, and
facilitates telework objectives. The revised telework regulation
was reviewed by the Library of Congress Regulation
Working Group and comments were forwarded to HRS for
final revision. The target date for implementation is the third
quarter of FY 14. |
Page 19 MARCH 2014 SEMIANNUAL REPORT TO THE CONGRESS
Table 4A: Significant Recommendations from Previous Semiannual
Reports for Which Corrective Action Has Not Been Completed
Subject |
Report No. |
Issue Date: |
Office Rec.No. |
Summary and Status of Recommendation |
Office of Support Operations (Continued) |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
I.3 |
Collect data on and evaluate the costs and benefits of teleworking
to determine whether it provides a cost-effective
means to perform specific work requirements—The Library
is reviewing best practices and is assessing infrastructure
equipment. In addition to collecting this telework data, the
TSC will conduct a cost-benefit analysis. The target date for
implementation is the third quarter of FY 14. |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
I.4 |
Develop a telework health and safety checklist and incorporate
it into its telework agreement forms—Under the revised
telework regulation, the TSC will develop a health and safety
checklist and each teleworking employee will complete and
submit the form. The target date for implementation is the
third quarter of FY 14. |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
I.5 |
Develop an interactive telework training program and require
teleworkers and their managers to successfully complete it
before beginning telework—The program will be released
with the revised telework regulation in the third quarter of
FY 14. |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
I.6 |
Revise LCR 2014-8 to address the permissibility of accessing
sensitive, unclassified, and “For Official Use Only” data at
offsite locations—The revised LCR was reviewed and comments
sent to HRS for final revision. Target date for implementation
is the third quarter of FY 14. |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
II.1 |
Review positions to determine whether they are prone to
telework and do not create an additional burden on other
areas—The telework LCR was revised to require that the nature
of the work be suitable for telework and not adversely
affect the workload or effectiveness of the teleworker, the
supervisor, or other employees. The LCR was forwarded to
the HRS Director. The target date for implementation is the
third quarter of FY 14. |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
II.2 |
Institute policies requiring the availability of teleworkers by
email, telephone, and in person when needed, including the
use of remote call coverage for positions involving frequent
telephone use—The revised telework LCR requires teleworkers
to be available for contact by telephone and email during
duty hours while teleworking. The LCR was forwarded to
HRS for final revision with implementation targeted for the
third quarter of FY 14. |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
IV.1.a |
Require employees who are expected to telework during a
Continuity of Operations (COOP) event to have adequate
training, infrastructure support, and practice—The Library’s
Remote Environment is a new key infrastructure element
that allows employees to telework during a COOP event.
Staff training and education is underway and a hands-on drill
that will implement this recommendation fully is anticipated
for the fourth quarter of FY 14. |
Page 20 MARCH 2014 SEMIANNUAL REPORT TO THE CONGRESS
Table 4A: Significant Recommendations from Previous Semiannual
Reports for Which Corrective Action Has Not Been Completed
Subject |
Report No. |
Issue Date: |
Office Rec.No. |
Summary and Status of Recommendation |
Office of Support Operations (Continued) |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
IV.1.b; |
Implement a telework agreement that provides for a COOP
event—The Library’s revised telework agreement allows for
episodic telework arrangements, including a COOP event.
The Human Capital Planning Board will ensure that agreements
are in place for COOP teleworkers. Target date for
implementation is the third quarter of FY 14. |
Telework Program |
2010-PA-102
June 2011 |
Office of Support
Operations |
IV.2 |
Incorporate teleworking scenarios in COOP exercises—The
Library’s new Remote Environment, a key infrastructure support
element that gives employees the ability to telework during
a COOP event, was designed to accommodate all COOP
scenarios. COOP exercises were incorporated into training
objectives. Exercises and full implementation are planned for
the fourth quarter of FY 14. |
Library Services (LS) |
Top Treasures Security
and Preservation
Controls |
2008-PA-103
January 2009 |
Library Services |
I.a |
Establish criteria for specifically defining top treasure collection
items and a clear process to nominate or transfer collection
items to the category—The draft LCR includes top
treasure nomination forms and an emergency release form.
The draft is under review with a target completion date in the
fourth quarter of FY 14. |
Surplus Books Program |
2010-PA-106
September 2011 |
Library Services |
I.c.1 |
Update LCR 1816 to include designing a serialized document
that is counterfeit resistant, reassigning the responsible
office to ensure oversight, documenting accountability, and
implementing procedures to more appropriately account for
and retire used passes. Revise the LCR to implement a pass
designed for specific Surplus Books Program (SBP) use—In
July 2013, the Office of Security and Emergency Preparedness
reported that it had finished meetings with stakeholders for
implementing a pass. The next steps are to incorporate revisions,
and schedule another meeting of the group, including
ITS. Updating the LCR will follow, with a target completion
date in the fourth quarter of FY 14. |
Surplus Books Program |
2010-PA-106
September 2011 |
Library Services |
II.a.1 |
SBP management should implement the use of a software application
to collect and analyze program operating data—As a
secondary project, the ITS staff member assigned is continually
pulled off the project to address other assignments. This has impacted
the completion date and implementation is now projected
for the third quarter of FY 14. |
Surplus Books Program |
2010-PA-106
September 2011 |
Library Services |
II.c.1 |
LS management should collect the required data to conduct an
analysis to determine whether the Library derives tangible benefits
from processing other agencies’ surplus material transfers—
SBP has not accepted transfers from other agencies since October
2011 and expects to keep that policy in effect. The target
date for a final decision is the fourth quarter of FY 14.
Unimplemented Recommendations |
Page 21 MARCH 2014 SEMIANNUAL REPORT TO THE CONGRESS
Unimplemented Recommendations
Table 4A: Significant Recommendations from Previous Semiannual
Reports for Which Corrective Action Has Not Been Completed
Subject |
Report No. |
Issue Date: |
Office Rec.No. |
Summary and Status of Recommendation |
Office of Strategic Initiatives (OSI) |
Information
Technology Strategic
Planning Follow-up |
2011-IT-103
December 2011 |
Information
Technology
Services |
I.2.C |
Account for all IT costs, including computer security as part of
the IT budgetary process—The Office of the Librarian continues
its information resources management (IRM) plan implementation
and IT spending and investment reviews. The results
of these reviews and current Library-wide planning will determine
whether any organizational or resource allocation changes
are warranted. The target implementation date is the first quarter
of FY15. |
Information
Technology Strategic
Planning Follow-up |
2011-IT-103
December 2011 |
Information
Technology
Services |
I.3.A |
Separate the IT support functions from OSI and establish the
Office of the Chief Information Officer (CIO) from the ITS Directorate
and other IT support functions of OSI. The CIO will
report directly to the Librarian or Deputy Librarian with duties,
responsibilities, and authority consistent with best practices—
The Office of the Librarian continues its IRM plan implementation
and IT spending and investment reviews. The results of
these reviews and current Library-wide planning will determine
whether any organizational or resource allocation changes are
warranted. The target implementation date is the first quarter
of FY 15. |
Information
Technology Strategic
Planning Follow-up |
2011-IT-103
December 2011 |
Information
Technology
Services |
I.5.A |
Implement service level agreements to manage customer expectations—
The current strategic planning process overseen
by the Strategic Planning Office (SPO) has a provision for
ITS to provide support to service units according to their
documented requirements. This recommendation is pending
further guidance from the strategic planning process with a
target completion date in the first quarter of FY 15. |
Information
Technology Strategic
Planning Follow-up |
2011-IT-103
December 2011 |
Information
Technology
Services |
I.5.D |
Rather than offering the new help desk system as an interface,
ITS should require all technology offices throughout the Library
to use a standard help desk system to take advantage
of economies of scale—ITS continues to work closely with
service units to leverage the centralized, shared solution for
help desk management. ITS plans to integrate the remaining
service units as resources are made available with a target date
in the first quarter of FY 15. |
Information
Technology Strategic
Planning Follow-up |
2011-IT-103
December 2011 |
Information
Technology
Services |
I.5.F |
Develop a set of metrics for ongoing use to measure performance.
These metrics should change and evolve over time
as one area shows improvement; new metrics should be developed
for other areas—A comprehensive set of metrics was
established as part of the new IT help desk contract. Over
the next several months ITS will gather baseline data in order
to evaluate the effectiveness of these metrics and determine
what refinements are necessary. The target date for completion
is the fourth quarter of FY 14. |
Information
Technology Strategic
Planning Follow-up |
2011-IT-103
December 2011 |
Information
Technology
Services |
I.5.G |
Conduct regular customer surveys and open informational
meetings—The Enhanced Help Desk project includes improvements
to survey capabilities tied to closed incident and
service request tickets. The target completion date is the third
quarter of FY 14. |
Page 22 MARCH 2014 SEMIANNUAL REPORT TO THE CONGRESS
Table 4A: Significant Recommendations from Previous Semiannual
Reports for Which Corrective Action Has Not Been Completed
Subject |
Report No. |
Issue Date: |
Office Rec.No. |
Summary and Status of Recommendation |
Office of Strategic Initiatives (Continued) |
Information
Technology Workstation
Management |
2012-PA-101
September 2012 |
Information
Technology
Services |
I.1 |
ITS should improve its communications and transparency
with service units regarding the IT equipment which is
available in inventory—The IT Asset Management & Configuration
Management Database (CMDB) project is being
chartered and will span 18-24 months. The CMDB will use
a phased approach to aggregate IT assets and configurable
items. In addition, ITS takes a monthly inventory and will
publish the information on the ITS Web site. Target date
for implementation of the first phase is the fourth quarter
of FY14. |
Library-Wide
Computing Efficiencies |
2013-IT-101
March 2013 |
Information
Technology
Services |
I.1 |
Collect data on efficiency levels of servers, maintain comprehensive
server inventory data in a central repository,
and continuously track data on the power used by its data
center—The resources required to implement server efficiency
tracking are supporting priority projects, including
the implementation of environmental controls monitoring
for Library collections and critical technology infrastructure
components. The target implementation date is revised to
the fourth quarter of FY 14. |
Library-Wide
Computing Efficiencies |
2013-IT-101
March 2013 |
Information
Technology
Services |
I.2 |
Report to the Deputy Librarian the progress made in adopting
the specific recommendations of the outside consultant’s
report on server virtualization, and the steps and timeframes
it will take to implement such recommendations and the Library’s
return on investment/cost savings to be achieved—
ITS is currently identifying viable recommendations from the
consultant’s report in the context of other strategic technology
initiatives, ongoing operational activities, and resource
constraints at the Library. ITS will construct a plan for implementing
viable recommendations and provide reasons for
those it will not implement. ITS anticipates completing this
plan by the third quarter of FY 14. |
Library-Wide
Computing Efficiencies |
2013-IT-101
March 2013 |
Information
Technology
Services |
II.1 |
Develop an enterprise-wide plan to guide management
decision-making on possible cloud solutions—ITS has developed
a plan to guide decision-making on potential cloud
solutions. This plan will be vetted with Library management
and stakeholders over the next several months with a target
date for completion in the fourth quarter of FY 14. |
Library-Wide
Computing Efficiencies |
2013-IT-101
March 2013 |
Information
Technology
Services |
II.2 |
Instruct ITS to take the lead in initiating evaluations of viable
cloud computing solutions for the Library—ITS has developed
a plan to guide decision-making on potential cloud
solutions. This plan will be vetted with Library management
and stakeholders over the next several months with a target
date for completion in the fourth quarter of FY 14. |
Enterprise wide
Web Search Strategy |
2013-IT102
September 2013 |
Office of the Librarian,
OSI, LS |
II |
LS should collaborate with the Web Governance Board and
ITS to evaluate whether there is usable data in the XML database
and, if so, develop a plan to migrate the data stored to
the new Web search platform—ITS is ready to work collaboratively
to evaluate the XML database and develop a plan to
migrate the usable data. The target date for implementation
is the second quarter of FY 15. |
Page 23 MARCH 2014 SEMIANNUAL REPORT TO THE CONGRESS
Page 24 MARCH 2014 SEMIANNUAL REPORT TO THE CONGRESS
Right: Fukagawa Hatiman yamabiraki, open garden at fukagawa Hachiman
Shrine by Hiroshige, c. 1857.
Repository: Prints and Photographs Division
Page 25 MARCH 2014 SEMIANNUAL REPORT TO THE CONGRESS
Implemented and Closed Recommendations
Table 4B: Significant Recommendations from Previous Semiannual Reports
Which Were Implemented or Closed During This Period
Subject |
Report No. |
Issue Date: |
Office Rec.No. |
Summary and Status of Recommendation |
Office of the Librarian |
Performance-based
Budgeting III |
2013-PA-101
March 2013 |
Library-wide |
I.1 |
Revise the performance management directives to address
requirements for service unit verification and validation
of performance data. Data requirements should
compliment the specific, measurable, achievable, relevant,
time-bound (SMART) criteria applied to performance
measurements. Verification requirements should
address data completeness, accuracy, and consistency as
well as the related quality control practices for ensuring
data will be of sufficient quality to document performance
and support decision-making. Validation procedures
should assure that the data are appropriate for the
performance measurement—Draft manuals were created
as part of the Governing Documents initiative. OCFO
held meetings, workshops, and briefings on SMART
criteria and verification and validation. OCFO also updated
the performance directives. |
Performance-based
Budgeting III |
2013-PA-101
March 2013 |
Library-wide |
I.2 |
SPO should take a more effective role in evaluating the
adequacy of service unit data used to measure progress
towards performance targets. Implement a process similar
to National Archives and Records Administration’s
metric specification document to define and prequalify
performance data and related performance measures
during the formulation stage of the performance cycle.
That document should require service units to identify
and define the performance data used to measure progress
towards performance targets. Service units should
also document how they intend to both verify the performance
data and validate how the data relates to the
performance measurement—SPO developed a template
describing how to create a performance target and conducted
several workshops. The forthcoming enhanced
eLCplans system requires designated service unit managers
and executives to review and approve performance
targets. |
Performance-based
Budgeting III |
2013-PA-101
March 2013 |
Library-wide |
I.3 |
SPO should review the metric specification document
for completeness and assure that service unit descriptions
of its verification and validation activities meet performance
methodology requirements—SPO implemented
a review process for draft and final service unit information
to ensure that descriptions meet performance methodology. |
Library Services (LS) |
Performance-based
Budgeting |
2010-PA-107
January 2011 |
Library Services |
II.2 |
Design and implement an internal control system that
will ensure that valid and verifiable data will be collected
and used to measure program performance—Library Services
implemented the new verification and validation system.
Officials responsible for performance targets received
training from SPO and used the system to establish FY 14
performance targets, milestones, and standards.; |
Page 26 MARCH 2014 SEMIANNUAL REPORT TO THE CONGRESS
Table 4B: Significant Recommendations from Previous Semiannual Reports
Which Were Implemented or Closed During This Period
Subject |
Report No. |
Issue Date: |
Office Rec.No. |
Summary and Status of Recommendation |
Human Resources Services (HRS) |
Multi-Sector Workforce |
2010-PA-105
March 2011 |
Human Resources
Services |
I |
Develop and implement a structured procedure that
provides a uniform method for making in/outsource
personnel determinations. This procedure should provide
the means to identify which activities are inherently
governmental and which service provider represents the
best value to the Library—The National Finance Center
Person model is fully implemented. The Board was provided
a process to apply existing procedures, workflows,
and approvals to accomplish the objectives within existing
policy framework. |
Office of Strategic Initiatives (OSI) |
Information
Technology Strategic
Planning Follow-up; |
2011-IT-103
December 2011 |
Information
Technology
Services |
II.1 |
Coordinate with service and support units to identify
and prioritize the legacy systems/applications that require
certification and accreditation evaluations, and
determine how the required evaluations should be
funded—Technical changes to LCR 1620, Information
Technology Security Policy of the Library of Congress were
completed in the fourth quarter of FY 13. |
Enterprise wide
Web Search Strategy |
2013-IT102
September 2013 |
Office of the Librarian,
OSI, LS |
III |
Determine whether there are any projects that are in development
but did not otherwise meet the ITSC’s criteria
of being a new project, and include them under the
ITSC’s purview—The ITSC chair requested that ITSC
members consider active IT projects as investments
tracked by the ITSC, with the goal of producing a report
of the review and results. One investment was added it
to the ITIM Control Phase. |